引用本文:
【打印本页】   【下载PDF全文】   View/Add Comment  Download reader   Close
←前一篇|后一篇→ 过刊浏览    高级检索
本文二维码信息
码上扫一扫!
神泉电站并网线路运行现状分析
魏恩甲1, 何自立1, 魏 宁2
1.西北农林科技大学 水利与建筑工程学院;2.西北农林科技大学 生命科学学院
摘要:
从电站输电线路建设投资、年电能损耗和电压损失等方面对神泉电站并网方案的运行现状进行了分析计算,并指出了该电站并网方案运行方式存在的问题,提出尽快实施合理的设计并网方案的必要性和可行性。
关键词:  神泉电站  并网方案  电能损耗  电压损失  运行效益
DOI:
分类号:
基金项目:
Analysis of current connect-in transmission system in Shenquan Hydroelectric Station
Abstract:
This article analyzed power transmission line's working state of Shenquan Hydroelectric Station concerning construction investment,annual electrical power loss and voltage decrease.Some practical problems of the connect-in strategy in this power station were pointed out and the necessity and feasibility of using the new plan were suggested.
Key words:  water power station  connect-in strategy  annual electrical power loss  voltage decrease  profits analysis

You are the NO.93576138
Copyright©2009:Editorial Department of Journal of Northwest A&F University (Natural Science Edition)
Designed by Beijing E-Tiller Co.,Ltd